Council rules built in
Auckland Christchurch Hamilton Wellington Tauranga Dunedin + All other BCAs

The delay isn't the council.
It's the application.

"An applicant should not submit an application knowing it is incomplete and use the Council RFI process as their quality control."

MBIE — Building Act guidance

The statutory consent clock is 20 working days. Councils are meeting it. The other 36 days — spent waiting for applicants to respond to RFIs — is almost entirely avoidable. Prelodge catches the triggers before you lodge.

  • Vague compliance statements — "complies with Building Code" without evidence is the #1 council frustration nationwide
  • Bracing calculations incomplete — sub-floor bracing non-compliant is near-universal on residential consents
  • Missing or unsigned Producer Statements — PS1 with vague scope triggers RFIs every time
  • Generic E2 detail sheets — copied standard details flagged at every council
  • Stormwater path not shown — top-5 clause nationally, easily addressed before lodging
  • Pipe sizes and gradients missing — G13 is a top-5 RFI clause and completely avoidable

Three steps.
Under three minutes.

Prelodge works through your project profile and cross-references it against a structured database of RFI trigger patterns — weighted by how commonly each item is cited, and adjusted for your council's known requirements.

01

Enter your project profile

Project type, council, structural approach, site conditions, services involved. Takes about 90 seconds. No sign-up required.

02

Get your risk assessment

Prelodge cross-references your inputs against known RFI patterns for your project type and council. High, medium, and low risk items with specific, actionable guidance — not generic checklists.

03

Fix it before you lodge

Work through the pre-lodgement checklist, address the flagged items, and lodge with confidence. Print the report or save it with your application documents.

Project-specific.
Not generic.

Every risk item references the specific NZBC clause, explains what's needed for your project, and tells you exactly how to address it. Not "check your drawings" — but what specifically to check and why.

High Risk

Bracing calculations — sub-floor not addressed

Provide full bracing demand and capacity calculations per NZS 3604 Section 5. Sub-floor bracing is near-universally incomplete — confirm sub-floor bracing schedule matches the bracing plan.

B1 / NZS 3604 S5 · Structural
High Risk

Stormwater path not shown on site plan

Show the complete stormwater flow path on the site plan: roof catchment areas, downpipe locations, and connection to the legal discharge point. E1 is a top-5 RFI clause nationally.

E1 · Surface Water
Medium Risk

R-values not specified — "to H1" is not sufficient

State actual R-values for all building elements. "To H1" or "insulation to comply with H1" is not acceptable — every element needs an explicit R-value shown on drawings.

H1 · Energy Efficiency

Built for the people
who prepare applications.

LBP Designers & Draughtspersons

You know the process but RFIs still happen under time pressure. Prelodge runs a systematic check against the patterns that catch designers out — before you lodge, not after.

  • Reduces rework and RFI response time
  • Protects your professional reputation
  • Council-specific requirements built in
  • Printable report to share with clients
  • Flags project-specific risks, not generic checklists

Owner-Builders & Project Managers

Preparing your own application or managing a designer's work? Prelodge helps you understand what a complete application looks like and gives you a framework to hold your designer accountable.

  • Understand what councils actually check
  • Hold your designer accountable
  • Avoid costly delays before they happen
  • No technical knowledge required to run a check
  • Free to use — no sign-up needed

NZ consent data.
Council by council.

MBIE publishes building consent performance data for every BCA in New Zealand. The problem is consistent — and consistently avoidable. Prelodge is built on this data.

Council Applications/year RFI rate Median RFI response
Auckland Council 33,690 81.6% 17 working days
Hamilton City Council 3,009 70.2% 15 working days
Tauranga City Council 3,503 67.7% 8 working days
Whanganui District 1,348 75.3% 4 working days
All NZ BCAs (national average) 73,213 64.6% 11 working days

Source: MBIE Building Consent System Performance Monitoring, year ended June 2025.

Your next consent.
Without the RFIs.

Run a free pre-lodgement check on your project. Takes under three minutes. No sign-up, no cost, no obligation — just a risk report you can act on before you lodge.

Free · No sign-up · Works on mobile · NZ Building Code data